August 1, 2025
Work completed in the last week includes:
- Curb removals;
- Roadwork on 54 Street related to the road closure;
- Installation of pre-cast bases for new lighting along the corridor;
- Catch basins installed along the corridor;
- Saw cuts and curb removals for concrete repairs; and
- A new hydrant installed on 54 Street.
Work anticipated over the next week:
- Base work and road construction on 54 Street related to the road closure;
- Electrical drilling to install power cables for new lighting along the corridor; and
- Concrete installation throughout the corridor including curbs and entrances.